Balfour Before And Afters
PDF – 2.4 MB 120 downloads

Hotel dining and reception Marriot Milton Keynes 

Rear extension garage conversion and full re-model of downstairs, two sets of bifold doors vaulted ceiling with two velux windows, re located new kitchen and utilised under stair space for W/c, new veissman boiler and full house rewire, including radiators plinth heater and towel radiator, 98m2 of lvt flooring new doors skirting and architrave. Closed existing open man hole to raised access chamber, time schedule 8 weeks to complete.

Bifolds fitted to extension 

Kitchen pre worktops 

.stair wall removed and balustrades fitted to make open space 

Rear extension before bifold doors are fitted 

Front with window and door fitted.

Wc fitted neatly under existing staircase to create much required downstairs facilities 

Newly formed larger square bay window with pitched roof 

Previous front view prior to garage conversion and double size front door .

Front finished, monoqouche render to give a full modern look

Finished kitchen with white quartz worktops, upstands and cooker splash back 

Rating: 4.1764705882353 stars
17 votes