Renov8 property ltd

Renov8 property ltd was created by John stacey who is skilled in all aspects of the building trade, having been in the industry since 1984 starting with paint and decorating, to 1987 was a labourer for a bricklayer subsequently learned the trade and moved on to learn plastering and dot and dab plaster boarding. Started working for a company in 1998 with a large portfolio of properties in need of full renovations so plumbing carpentry and kitchen-bathroom fitting became part of daily work schedules, this continued through till 2007 where work would go into the commercial sector, again working for another company acquiring site manager certification and gaining best in build awards for the company, from metal stud walls to suspended ceiling's, working on Hotel receptions & bathrooms, colleges, schools, to house extensions there are no works that haven't been undertaken, and seen through to the highest of standards. In addition to Renov8 Johns son Andrew has accumulated as many skills with carpentry being his first and foremost trade, however has himself picked up on all the trades, between them both the attention to detail on all jobs are second to none. With a team of highly skilled trades Renov8 are your one stop shop with no holdups along the way due to waiting on other trades to arrive. 

Installed huge steels to allow for 3600 long bifold doors,opened internal walls x2 to make open plan via garage conversion, fitted double pocket doors and kitchen relocated, moved existing cloakroom to create more space in hallway, new lighting and pressured hot  water system with viseman boiler. Total cost including all materials £68,000

 

 

 

 

 

Removal of internal walls and steel RSJ's fitted to create huge open area for shop floor space, cost for steel works £6400 including fabrication structural engineers drawings and building control.

Porcelanosa bathroom ensuite, supplied and fitted including removal of existing suit, re boarding walls and floor to create wet room with floor level outlet pipework alterations,and a power pump fitted direct from water tank. cost for bathrooms start at £600 like for like changeover, tiling start price is £35 per square metre, This suite start to finish costing £8900 including all materials which were all high end products.

Brick and block work with bricks to match existing with double plinth stretcher to half height.

 

 

 

 

 

 

Porcelain 600x600 polished floor tiles laid using a levelling system 45square metres cost to lay £2475 including adhesive and grout, tile cost £1350

This job took 2 days to complete day 2 was grouting only , with an empty room working times are reduced and work can be finished to a better standard. 

 

 

 

 

 

 

Supply and fit of complete kitchen to include integrated appliances solid oak worktop and breakfast bar wine chiller and porcelain sink, full cost £9200, Kitchens supply and fit start from as little as £2500 

Renovation to shop internal and external to customers requirements work duration 9 days.

To include altro welded flooring and scaffold style handrails.

 

 

 

 

 

 

Large format 1200x1200 porcelanosa floor tiles layed on decoupling mat 100square metres 3 days to complete £60 per square meter tiles £200 each

Removal of supporting wall,  new blockwork and insertion of 2 new doors either side 

Installed walk in wardrobe and ensuite bathroom with herringbone tiling

Rear single storey extension with 2 roof lanterns, triple bifold doors, structural works, and rendering ,cost start to finish incuding plastering painting skirting electrics and boiler relocation £24000